A Quantitative Model for Measurement of Factors Affecting Logistical Lead Time

  • Camila Avosani Zago Universidade Federal de Santa Catarina
  • Sergio Fernando Mayerle Universidade Federal de Santa Catarina
Keywords: lead time logistic, production systems of the metal-mechanical sector, reduction of delivery time of critical materials, tools for planning

Abstract

In order to compete with constant alterations, time becomes an important competitive difference to enterprises that may decrease their logistical lead time, which means duration from the placement of the demand creation to the delivery of the client product. This article aims to identify and quantify the factors that significantly influence the logistical lead time of production systems in the metal-mechanical sector. This is done by a field survey that has been conducted based on a theoretical study of it, when the influencing factors in lead time have been established hierarchically, which were quantified on the basis of a regression model, and legitimized by a group of experts and managers. The most relevant results were: i) the use of tools for planning; ii) the reduction of time to surrender the critical materials; and iii) the elimination of rework.

Downloads

Download data is not yet available.

References

Ballard, G., Harper, N. e Zabelle, T. (2003). Learning to see work flow: an application of lean concepts to precast concrete fabrication. Engineering Construction and Architectural Management, 10 (1), 6-14.
https://doi.org/10.1108/09699980310466505

Bartezzaghi, E., Spina, G. e Verganti, R. (1994). Lead-time Models of Business Processes. International Journal of Operations & Production Management, 14 (5), 5-20.
https://doi.org/10.1108/01443579410056768

Bowersox, D., Closs, D. e Cooper, M. B. (2006a). Gestão logística de cadeias de suprimentos (Trad. Camila Teixeira Nakagawa e Gabriela Teixeira Nakagawa). Porto Alegre: Bookman.

Bowersox, D., Closs, D. e Cooper, M. B. (2006b). Supply chain logistics management (2. ed). Nova Iorque: McGraw-Hill.

Chhajed, D. e Kim, K. (1995). How important are lead time? New York: Purchasing.

Charney, C. (1991). Time to market: reducing product lead time. Michigan: Society of Manufacturing Engineers.

Chase, R. B., Jacobs, F. R. e Aquilano, N. J. (2006). Administração da produção e operações para vantagens competitivas (Trad. Cláudia Freire, Lucas Marcelo Ferreti Yassumura e Monica Rosali Rosemberg; 11. ed). São Paulo: McGraw-Hill.

Christopher, M. (1998). Logistics and supply chain management. Londres: Prentice Hall.
PMCid:PMC1565158

Christopher, M. (2008). Logística e gerenciamento da cadeia de suprimentos: criando redes que agregam valor (Trad. Mauro de Campos Silva; 2. ed). São Paulo: Cengage Learning.

Chopra, S. e Meindl, P. (2003). Gerenciamento da cadeia de suprimentos: estratégia, planejamento e operação (Trad. Claudia Freire). São Paulo: Pearson Prentice Hall.

Contador, J. C. (2004). Gestão de operações: a engenharia de produção a serviço da modernização da empresa. São Paulo: Edgard Blucher.
PMid:15274108

FIESC. (1999). Santa Catarina em dados. Florianópolis: FIESC.

FIEP. (2010). Complexo metal mecânico paranaense. Curitiba: FIEP.

Fry, T. D. (1990). Controlling input: the real key to shorter lead times. The International Journal of Logistics Management, 1 (1), 7-12.
https://doi.org/10.1108/09574099010804491

Fry, T. D., Karwan, K. R. e Steele, D. C. (1991). Implementing drum-buffer-rope to control manufacturing lead time. The International Journal of Logistics Management, 2 (1), 12-18.
https://doi.org/10.1108/09574099110804634

Gaither, N. e Frazier, G. (2002). Administração da produção e operações (8. ed.). São Paulo: Thomson Learning.

Hair Jr., J. et al. (2005). Fundamentos de métodos de pesquisa em administração (Trad. Lene Belon Ribeiro). Porto Alegre: Bookman.

Harrison, A. e Hoek, R. V. (2003). Estratégia e gerenciamento de logística (Trad. Bazán Tecnologia e Lingüistica). São Paulo: Futura.

Hunoff, R. (2011). Setor metal-mecânico cresceu 19% no RS. Disponível em .

Kilgore, S. S, Orlov, L. M. e Child, M. (Mar., 2002). Balancing supply and demand. The TechStrategy Report, [s. l.].

Lambert, D. M., Stock, J. R. e Ellram, L. M. (1998). Fundamentals of logistics management. Nova Iorque: McGraw-Hill.
https://doi.org/10.1108/09574099810805807

Leenders, M. R. et al. (2006). Purchasing and supply management: with 50 supply chain cases (13. ed.). Nova Iorque: McGraw-Hill.
PMCid:PMC2117736

Lei, Y., Rong-Qiu, C. e Li, L. (2007). Study on inventory models based on the relationship between lead time and customer waiting time. IEEE.
https://doi.org/10.1109/ICSSSM.2007.4280139

Li, Y. (July, 2009). A standard lead time calculator based on optimization technique. Proceedings of the Eighth International Conference on Machine Learning and Cybernetics, Baoding.

Liulci, Luohua e Tang Xiao-Wo. (2006). Service delivery lead time model based on customer demand characteristics. IEEE.

Locke, D. (1996). Global supply management: a guide to international purchasing. Chicago: Irwin.

MacCarthy, B. e Fernandes, F. (2000). A multi-dimensional classification of production systems for the design and selection of production planning and control systems. Production Planning & Control, 11 (5), 481-496.
https://doi.org/10.1080/09537280050051988

Milléo, H. (2011). Setor metal-mecânico cresce 79% em dez anos. Gazeta do Povo. Disponível em .

Minuzzi, J. (2011). Desenvolvimento de metodologia para identificar competências da governança endógena de arranjos produtivos locais. (Tese Doutorado em Engenharia de Produção). Universidade Federal de Santa Catarina, Florianópolis.
PMid:21349136

Moura, C. E. de. (2004). Gestão de estoques: ação e monitoramento na cadeia de logística integrada. Rio de Janeiro: Ciência Moderna.

Nishida, L. T. (2006). Reduzindo o lead time no desenvolvimento de produtos através da padronização. Disponível em http://www.lean.org.br.

Sebrae. (2010). Santa Catarina em números: metal mecânico. Florianópolis: Sebrae.

Sellitto, M. A. e Walter, C. (2008). Medição e controle do tempo de atravessamento em um sistema de manufatura. Revista Gestão e Produção, 15 (1), 26-36.
https://doi.org/10.1590/S0104-530X2008000100012

Shen, C. e Zhang, X. (September, 2009). Pricing and lead time joint decisions in two-echelon supply chain with retailers competition. International Conference on Management Science & Engineering (16th), Moscow, Russia.
https://doi.org/10.1109/ICMSE.2009.5318235

Shingo, S. (1996). Sistemas de produção com estoque zero: o Sistema Shingo para melhorias contínuas (Trad. Lia Weber Mendes). Porto Alegre: Artes Médicas.
PMid:8905671

Slack, N., Chambers, S. e Johnston, R. (2002). Administração da produção (2. ed.). São Paulo: Atlas.

Stevenson, W. J. (2001). Administração das operações de produção (6. ed.). Rio de Janeiro: LTC.

Tubino, D. F. (1999). Sistemas de produção: a produtividade no chão de fábrica. Porto Alegre: Bookman.
PMid:10090906 PMCid:PMC1377845

Voltolini, E. (2010). Convergência entre cadeia de suprimentos ágil e gestão colaborativa da demanda (Tese Doutorado em Engenharia de Produção). Universidade Federal de Santa Catarina – UFSC.

Wacker, J. (1996). A theoretical model of manufacturing lead times and their relationship to a manufacturing goal hierarchy. Decision Sciences, 27 (3), 483-518.
https://doi.org/10.1111/j.1540-5915.1996.tb01823.x

Wang, X., Liu, Z., Zheng, C. e Quan, C. (2008). The impact of lead-time on bullwhip effect in supply chain. IEEE.
https://doi.org/10.1109/CCCM.2008.224

Wang, X., Wang, K. e Zhongbin, Q. (2009). Sensitivity analysis of lead time in MRP system: a case study. Crown.
https://doi.org/10.1109/ICMSS.2009.5301796

Wiendahl, H. (1995). Load-oriented manufacturing control. Berlin: Springer-Verlag.
https://doi.org/10.1007/978-3-642-57743-7
Published
2017-07-30
How to Cite
Zago, C., & Mayerle, S. (2017, July 30). A Quantitative Model for Measurement of Factors Affecting Logistical Lead Time. Revista Científica General José María Córdova, 15(20), 185-207. https://doi.org/10.21830/19006586.180
Section
Technoscience